New landscaping along Tasman and Gr Am lot
New High voltage electrical installation at very north end of Gr Am Lot. After thinking about it I'm guessing it's for Light Rail. It's near the Gr Am station. I think they moved this here as part of the renovation of the station to get it out of the way.
Row of handicapped parking spots. there are 5 such rows across the east side of Gr Am lot and the very east end of the lot is all handicapped spots. What's interesting is the 5 rows sticking out have signs saying they are general parking when parking for Great America as seen in the photo below. But the very east end spots are all permanently handicapped spots
I didn't think to look closely at the signs to see if they can be changed to handicap for Levi's events. The ground has handicapped painting already
intel banner at intel plaza/gate A
South end video board from top of parking garage. This image was up the whole time I was there
Yellow lot 2. You can see it's much less crowded than the last time I was there. They are starting to empty it in preparation for paving
the backside of the Pepsi sign. If you look closely you can see some cabling is in place. It will be an electronic display board. I expect there will be a lot more cabling and then it will be enclosed. I have a frontside photo later
Lettering that adds up to "Stadium" I have no idea what they will do with that.
Starting to put up gates
closeup
Really strange that they have this roll up at the far east end of Gate A
close up
installed gates and fencing on west side of stadium. I guessing since there is a gate to the dirt road between the fencing and the creek that is will remain in some form as an access road. Note the fencing/gates at ground level preventing walking around tower at ground level.
This is the east end of the north ped bridge (right at Tasman). Note the handrails wrapping around ends. The other end of the bridge has a gate. It looks to me that this end of bridge will be open to the street and with the handrails there I don't understand how they will mount a gate.
zoomed in view of fencing and landscaping on west side of tower
installing fencing between bridge and Tasman
concessions at north end of tower on intel plaza
close up of gates to street access
Close up of gates enclosing ground level on west side of tower
ground level view of Gate A
View from under north ped bridge of same workers installing fencing as shown earlier
Lights under north Ped bridge along creek trail. There are no lights under Tasman street bridge right next to it which is a much wider span. This is significant because this route can be used to get to the yellow lots and the golf course lots (there is another ped bridge crossing the creek into the golf course just to the north) for those avoiding the crowds on Tasman in front of the stadium
Front side of the Pepsi sign from the creek trail. You can see some of the trim was starting to go on also confirming it's an electronic sign
Last time I wasn't sure this was final "look" of fencing. I guess it is.
Similar colored lights going up on middle bridge as on canopy above tower. Nice repeated design element.
Dignity Health gate at SW corner. I wasn't positive before but it looks like no electronic signage here
close up. Note the installed fencing in the background
Dignity banner
South ped bridge already has colored accent lights installed
The very SE corner of Gr Am lot is now cleaned up and fully paved.
Electric vehicle charging parking spot ground lettering
2 EV charging spots are designated handicapped
They are still working on electrical boxes that are blocking these few spots (re-routing?)
back of Bud Light sign FWIW
The area around the south ped bridge and original vehicle bridge still has temporary construction fencing between GR Am Lot and Creek trail. Also the vehicle bridge still has no permanent gate.
No real sign yet for last founding sponsor on east side of stadium
This is mounted on top of the canopy above the west side of the tower in the center of the west face. I never saw it before. Camera maybe?
Another colored accent light being installed in middle bridge.
Another view of intel banner
This view of west end of north ped bridge shows colored accent lights have not been installed yet. since the other 2 bridges have them I expect they'll be installed there too.
Construction on improvements to Gr Am light rail station is almost complete
zoomed out view
Toyota gate at NE corner. Still no banners there.
Remember what was Centennial dr south of Tasman was renamed Marie P DeBartolo way last year. So Levi's stadium is on Marie P. DeBartolo Way, not Centennial.
The very short section north of Tasman is still Centennial
They finished repaving Marie P. Debartolo since my last visit.
backside of intel banner
My attempt at being artsy
Last attempt.